Installation of pressed paving
1. On wet ground, lay plastic sheeting before the screed. Wet the concrete screed to be paved.
2.ย Wet the tiles.
3. Prepare a 1.5 to 2.5 cm thick mortar, composed of one part cement and two parts sand. Sprinkle cement on the prepared surface
4. Lay the tiles and level them.
5. After a few hours, the entire surface should be thoroughly wetted.
Reviews
There are no reviews yet.